CISS.SideMenu

Project Counter Widget

Fallago Rig 2 will have an installed capacity of up to 41.45MW of low carbon energy, approximately enough to power

homes*

* based upon information sourced from Digest of UK Energy Statistics and Department of Energy and Climate Change

Project Contact Widget

Project Contact details

EDF Energy Renewables
Alexander House
1 Mandarin Road
Rainton Bridge Business Park
Houghton le Spring
SUNDERLAND
DH4 5RA

Email: info@edf-er.com

Tel: 0800 0566650

Documents Link

Project Overview Widget

Project overview

Fallago Rig 2

EDF ER has applied to the Scottish Ministers for consent to construct and operate an extension to the Fallago Rig Wind Farm, approximately 7.5km north of Westruther and 7.9km south of Gifford, in the Scottish Borders (central Grid Reference NT5803059600). The installed capacity of the proposed extension to the generating station would be 41.4 MW comprising 12 turbines with a ground to blade tip height of up to 126.5 metres, and their associated infrastructure. This application is referred to as Fallago Rig 2....more

Latest News Widget

Latest News

  • Please visit our latest news section for more information.

© EDF Energy 2017. All rights reserved.